Laundry room with washer and dryer, white cabinets, wall hooks, and a workbench.

Preparing for your project

How to prepare, how long each phase takes, and when your garage is back in service. No surprises, just a clear plan.

Before we arrive: clearing the space

Installation day needs a bare garage. Before our crew shows up, everything has to come out, vehicles, bins, shelving units, and anything hanging on the walls we'll be working on. A clear, open space lets us prep your concrete, install cleanly, and finish on schedule.

✅ Start clearing 2–3 days early
✅ Stage items in the driveway or a spare room
✅ Purge what you no longer need before the new garage goes in

A clean garage with storage shelves, a refrigerator, a water heater, and various tools and containers organized on the walls and shelves.

YOUR PROJECT ROADMAP

Floor installation and cure schedule

Here's how the floor phase unfolds, from grinding the slab to parking the car back inside.

Step 1 sign with bold text on a white background, outlined in dark blue
Step 02 label with bold text on a dark background.

24 HOURS

Walking on the floor is generally safe.

Step 03 in a guide or instructions, displayed on a white and purple background.

48–72 HOURS

Bins, totes, and lighter shelving can start migrating back in.

Sign displaying 'STEP 04' in bold letters.

INSTALLATION DAY

We grind the slab, fill cracks and pits, and apply the coating. Once coating begins, the garage is sealed off.

5–7 DAYS · FULL CURE

Park the cars, roll in the tool chest, slide the workbench into place. The floor is ready for everything.

Wisconsin's climate is a real variable. Cool temperatures and humidity stretch cure times, so a November install may run on a different clock than one in July. Your crew lead confirms firm dates before they leave.

Clean, organized garage with gray cabinets, sports equipment on walls, and a gray speckled floor.

Installation Timeline: Cabinets and Storage

Storage is the fast part. While floors run on a cure clock, cabinets, slatwall, and overhead racks go in quickly and you don't have to wait to use them.

A single day, start to finish. Most cabinet, slatwall, and overhead rack installs wrap in one day. Our crew arrives with your system built to the measurements we captured at your consultation, mounts everything securely, and walks the finished result with you before they leave. By that same evening, you can load your tools, hang your gear, and stock the shelves — no curing, no waiting, no second visit.

Floors first, then storage. When your project includes both flooring and storage, the sequence never changes: the floor goes down first. Cabinets and wall systems get installed two to three days later, once the coating has hardened enough for us to work on it without risking the finish. Mounting cabinets to a wall and anchoring racks to the ceiling doesn't touch the floor's cure, so this gap keeps both phases clean and protects the work you've already paid for.

You'll know the calendar up front. Every combined project gets a complete schedule at your consultation — install dates, the cure window between phases, and the day your garage is fully back in service. No guessing, no surprise delays. You'll know exactly when to clear the space and exactly when life returns to normal.

WHITE GLOVE SERVICE

Don't want to lift a finger?

Temporary storage

Secure storage quoted and coordinated

Pack out

We remove everything before install

Junk hauling

Unwanted items hauled off for good

If you want the Garage Elevations team to handle everything from start to finish, let your design professional know and we will include it in your estimate.

Re-organization

Items returned and organized in your new system